Yep, think by now I have the sequence figured out

At some point everything will be match-drilled and clecoed #40. Then you'll go back and updrill/cleco. After all that is finished, skins will be clecoed to ribs. You will be dealing with 100's of 1/8 clecos in #31 holes. Then everything comes apart for deburring/dimpling. When you put all those 1/8 clecos back in the dimpled holes they'll go in/out much easier. Before dimpling, not so easy.
Tony