Page 1 of 2

Re: Avionics platform under forward deck

Posted: Wed Nov 27, 2024 7:54 am
by monclerjacket

Re: Avionics platform under forward deck

Posted: Mon Sep 23, 2024 1:26 pm
by monclerjacket

Re: Avionics platform under forward deck

Posted: Wed Aug 21, 2024 8:47 am
by monclerjacket

Re: Avionics platform under forward deck

Posted: Sun Apr 28, 2024 11:14 am
by monclerjacket

Re: Avionics platform under forward deck

Posted: Thu Jun 04, 2020 8:19 pm
by fwellman@att.net
Guys, thanks for the pics and info. You both have given me some good ideas. Much appreciated.

Re: Avionics platform under forward deck

Posted: Tue Jun 02, 2020 8:56 pm
by jamesmil
45B963A5-91DC-455B-8794-3CD5BADAB76F.jpeg

Kind of hard to see but I used .090 Lexan as a tray .

Re: Avionics platform under forward deck

Posted: Tue Jun 02, 2020 4:42 pm
by tomkk
Here's a link to my build photos: https://photos.app.goo.gl/HvV8XnPvk7fcZD778 My avionics work starts about 2/3 down, a little before the engine work but mostly after the engine build. I'm not sure but I think I used 0.040 aluminum for my shelves.

Re: Avionics platform under forward deck

Posted: Tue Jun 02, 2020 2:35 pm
by fwellman@att.net
Hello all,

These threads about the avionics deck are quite old, and the photos referenced are no longer available.

I'm a little stuck on the tray.

Does anyone have pictures of their avionics tray to share? Also, I'm not sure what thickness or type of aluminum would be best for the tray, 0.63 6061 t6? Any information at all would be very much appreciated.

Thanks
Fred

Re: Avionics platform under forward deck

Posted: Sun Jan 11, 2015 11:00 am
by danweseman
also no need for a permanent spacer. just slide some in during drilling. and remove after its drilled.

Re: Avionics platform under forward deck

Posted: Sun Jan 11, 2015 10:59 am
by danweseman
at the sides the flange can go up if you want, or down . a extra .025 will hardly mater. I would go down at the firewall and panel though