Show/Hide Toolbars

Panther Builders Manual

1. Slide joggle strip behind skin and against angle just installed.  Transfer drill holes from skin into joggle.  Joggle should be inboard to allow for the thickness of the cowling.

Cheekinstallation5

Cheekinstallation6

2.Remove strip and cutout a 5/8” notch from bottom to allow for the exhaust tunnel fairing  to fit.

Cheekinstallation7.

3.This picture shows the joggle strip for the right side.

Cheekinstallation8

4.Repeat the steps for the right side.  Picture below shows both cheek formers and cowl joggle strips installed, along with the exhaust tunnel formers.  It really starts to show the shape at the firewall now.

Cheekinstallation9