Show/Hide Toolbars

Panther Builders Manual

Navigation: Tail Assembly > Vertical Tail > Vertical Stab

Assembling the frame work

Scroll Prev Top Next More

 

1.Cleco the main ribs to the rear spar.

2.Cleco the main ribs and nose to the forward spar.

*NOTE- there is no nose rib in the middle of the VT at location of rib 2.  Nose rib 3 is at top adjacent nose main rib 3.