Show/Hide Toolbars

Panther Builders Manual

Navigation: Tail Assembly > Finishing the Tail

Elevator joiners

Scroll Prev Top Next More

Please see the section Elevator Rigging under Rigging.  

 

When satisfied with fit drill #30 (or #31 if flush rivets) - cleco, then disassemble, debur and rivet joiner to ribs and ribs to elevators.

*NOTE - use CCP (stainless) rivets to install the steel joiner to the ribs